
中空玻璃生產(chǎn)線的操作必備哪些規(guī)程?
時(shí)間:2026-08-07 來源:http://www.hyjsrq88.com/ 發(fā)布人:昌盛機(jī)械
中空玻璃生產(chǎn)線作為目前玻璃深加工行業(yè)中非常受人歡迎的生產(chǎn)設(shè)備,在加工方面速度更快質(zhì)量更好,相比于其他生產(chǎn)設(shè)備具有一定的優(yōu)勢(shì),中空玻璃生產(chǎn)線通俗的意思就是生產(chǎn)制造中空玻璃的一款設(shè)備,很多用戶在操作中空玻璃生產(chǎn)線的時(shí)候都存在一些錯(cuò)誤的方法,因此下面就讓小編為大家詳細(xì)介紹中空玻璃生產(chǎn)線的操作規(guī)程,讓我們一起來了解下吧。
As the most popular production equipment in the glass deep processing industry, the insulated glass production line has faster processing speed and better quality. Compared with other production equipment, it has certain advantages. The simple meaning of insulated glass production line is a device for producing and manufacturing insulated glass. Many users have some incorrect methods when operating the insulated glass production line. Therefore, let me introduce the operating procedures of the insulated glass production line in detail for you. Let's learn about it together.
中空玻璃生產(chǎn)線的操作規(guī)程有哪些?
What are the operating procedures for insulated glass production lines?
一、準(zhǔn)備工作
1、 Preparation work
1、開啟總電源;
1. Turn on the main power supply;
2、水箱注滿誰,每班生產(chǎn)前30分鐘開啟水加熱器;
2. Who fills the water tank and turns on the water heater 30 minutes before each shift's production;
3、開啟傳送、加熱、檢查燈、風(fēng)機(jī)、毛刷、水泵。
3. Turn on the conveyor, heating, inspection lights, fan, brush, and water pump.
二、操作步驟
2、 Operation steps
1、將玻璃放入清洗機(jī)進(jìn)料段,手推玻璃進(jìn)入清洗段,玻璃經(jīng)清洗干燥到出料段;
1. Put the glass into the feeding section of the cleaning machine, push the glass into the cleaning section by hand, and dry it to the discharging section after cleaning;
2、在出料段檢查玻璃清洗質(zhì)量;
2. Check the quality of glass cleaning in the discharge section;

3、玻璃進(jìn)入覆片機(jī),到達(dá)終點(diǎn)接近開關(guān)時(shí),玻璃自動(dòng)停在定位柱處;
3. When the glass enters the laminating machine and reaches the end point near the switch, the glass automatically stops at the positioning column;
4、覆片機(jī)末端設(shè)有腳踏電開關(guān),踩腳踏開關(guān),鋁框定位移出,將打好膠的鋁框定位安放,再次踩腳踏開關(guān),鋁框定位縮回;
4. The end of the laminating machine is equipped with a foot pedal switch. When the foot pedal switch is pressed, the aluminum frame positioning is moved out, and the glued aluminum frame positioning is placed. When the foot pedal switch is pressed again, the aluminum frame positioning is retracted;
5、與上步驟同時(shí),第二片玻璃經(jīng)清洗干燥后,已經(jīng)自動(dòng)停在清洗機(jī)出料段末端的接近開關(guān)處待用;
5. At the same time as the previous step, the second piece of glass, after being cleaned and dried, has automatically stopped at the proximity switch at the end of the discharge section of the cleaning machine for use;
6、將第二片玻璃人工移到覆片機(jī),與第一篇玻璃合片;
6. Manually move the second piece of glass to the laminating machine and laminate it with the first piece of glass;
7、按輥壓合片機(jī)啟動(dòng)按鈕,合好片的玻璃自動(dòng)進(jìn)入輥壓合片機(jī),經(jīng)輥壓,玻璃達(dá)到預(yù)定厚度尺寸;
7. Press the start button of the roll laminating machine, and the laminated glass will automatically enter the roll laminating machine. After rolling, the glass will reach the predetermined thickness size;
8、合好片的玻璃進(jìn)入翻轉(zhuǎn)臺(tái),自動(dòng)停在翻轉(zhuǎn)臺(tái)末端,踩腳踏開關(guān)2,臺(tái)面放出平料。
8. The folded glass enters the flipping table and automatically stops at the end of the flipping table. Step on foot switch 2, and the table will release the flat material.
三、每班結(jié)束時(shí),關(guān)閉控制臺(tái)上各按鈕,再關(guān)總電源。
3、 At the end of each shift, turn off all buttons on the control panel and then turn off the main power.
四、注意事項(xiàng)
4、 Precautions
1、玻璃在清洗前建議經(jīng)過磨邊,否則會(huì)對(duì)部分構(gòu)件造成損傷。
1. Glass must be polished before cleaning, otherwise it may cause damage to some components.
2、向水箱及軟化水裝置注水的自來水開關(guān)保持開啟且水量充足。
2. Keep the tap water switch for filling the water tank and softening water device open and ensure sufficient water volume.
3、根據(jù)實(shí)際情況調(diào)節(jié)電器箱內(nèi)的水溫控制器來設(shè)定水溫,一般在15度至50度之間,亦可加中性洗滌劑,以達(dá)到非常佳清洗效果。
3. Adjust the water temperature controller inside the electrical box according to the actual situation to set the water temperature, generally between 15 degrees and 50 degrees. Neutral detergent can also be added to achieve the best cleaning effect.
4、調(diào)節(jié)無級(jí)變速器調(diào)速按鈕,根據(jù)玻璃污垢情況調(diào)定傳送速度(通常3m\min左右)
4. Adjust the speed control button of the continuously variable transmission and set the conveying speed according to the condition of glass dirt (usually around 3m/min)
5、清洗玻璃厚度為3~12mm,經(jīng)干燥后玻璃后邊緣有微量水珠。
5. The thickness of the cleaned glass is 3-12mm, and after drying, there are trace water droplets on the edge of the glass.
6、人和物不能置于翻轉(zhuǎn)臺(tái)的翻轉(zhuǎn)區(qū)域內(nèi),以保證安全。
6. People and objects cannot be placed within the flipping area of the flipping table to ensure safety.
7、安裝調(diào)整完后,請(qǐng)按照操作說明順序試車,若因調(diào)整不好而引起玻璃破裂,須迅速急停,傳送反轉(zhuǎn)倒出碎玻璃,并清理干凈,以免劃傷毛刷及傳送輥。
7. After installation and adjustment, please test drive according to the operating instructions. If the glass breaks due to poor adjustment, it must be quickly stopped, the conveyor should be reversed to pour out the broken glass, and cleaned thoroughly to avoid scratching the brush and conveyor roller.
8、機(jī)器各部分接地良好。
8. All parts of the machine are well grounded.
- 中空玻璃生產(chǎn)線的操作必備哪些規(guī)程? 2026/08/07
- 如何保養(yǎng)中空玻璃生產(chǎn)線? 2026/08/04
- 不同玻璃設(shè)備使用注意事項(xiàng) 2026/08/01
- 雙組份打膠機(jī)如何構(gòu)筑“雙重防護(hù)” 2026/07/30
- 全自動(dòng)鋁條折彎?rùn)C(jī)的工藝革命與價(jià)值重構(gòu) 2026/07/27
- 全自動(dòng)鋁條折彎?rùn)C(jī)如何將一根直條變成巧妙矩形框 2026/07/24
- 全自動(dòng)封膠線的效率革命與工藝突破 2026/07/22
- 中空玻璃加工設(shè)備如何打造建筑節(jié)能的“隱形冠軍” 2026/07/20
- 全自動(dòng)封膠線如何為玻璃穿上“防水鎧甲” 2026/07/17
- 中空玻璃加工設(shè)備的技術(shù)進(jìn)化與產(chǎn)業(yè)升級(jí) 2026/07/15
產(chǎn)品分類Product categories
聯(lián)系我們Contact us
- 咨詢熱線:0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉(xiāng)企巢工業(yè)園
- 掃碼聯(lián)系我們:

當(dāng)前位置:



